Declan and the team have been involved with a number of prestigious and high end Fit-Outs in Great Britain and Continental Europe for clients such as O2, IHG, Selfridges, Galeries Lafayette, Arsenal FC, M&M World, Louis Vuitton and CP Hart Bathrooms.
Creekside, Deptford, London
Oak3 are proud to have completed works on this mixed-housing development in Deptford, South London recently. We were on-site for a total of 14months, during which time we completed a full Second Fix program on 56 apartments divided between 2 blocks. All flooring, kitchen, skirting and fire-door works were completed by Oak3. We were also tasked with unique balcony tiling and bespoke finishes throughout. The large communal areas and children’s soft-play area were also handed over to the contractor.
Oldham Street, Manchester
Oak3 Ltd was proud to recently finish this large-scale residential project in Manchester City centre. The development which constitutes of two blocks and 98 apartments was one of our grandest achievements to date. Our brief comprised of the installation of over 30,000 sq.ft of limestone-finish laminate flooring, full general Second Fix as well as the installation of over 200 Italian doorsets & Firedoor sets. We were on-site for over 10months and concluded all works, as well as snagging, ahead of program.
Sky Store, White City
We recently completed the fit-out for Sky’s Flagship Store in White City. This was very important in our continued relationship with Sky due to it’s proximity to their Headquarters in Brentford. The 11-week programme had quite a hard deadline, as all works needed to be completed in order to facilitate Christmas shoppers. There were quite a few challenges and last-minute changes to the design, but we were very satisfied with how the project was handed-over. New flooring throughout, coupled with a complete redecoration and artisanal plaster finish meant that it was a highly intensive coordinated effort to ensure all aspects of the fit-out were completed, on schedule.
AO Arena, Manchester
This recent project had an incredibly tight turnaround of less than 7 days, which we proudly delivered on-time. New flooring was installed through the 600 sq.ft area, and a partition wall was rebuilt using fire-rated materials. A bespoke TV casing was installed including ambient lighting. The ceiling tiles were replaced within and modern paintwork throughout the unit. This was an another project we completed in conjunction with 442 design.
Corporate Box, Emirates Stadium, London
We were delighted to continue our relationship with Arsenal F.C with the renovation and remodelling of one of their Hospitality Suites. The project had a very quick turnaround time as we were onsite for less than a week. Specialist artwork and bespoke joinery were the principal features of the fit-out. Team colours and sponsorships were integrated into the project and highlighted the completed works in the suite.
Camden Residence, London
This is a residential project taken for a private client. Fitted wardrobes, benched seating & bespoke wardrobes highlighted the personal touches throughout the property. All works were completed on time, and specific to the client’s requirements. We completed FCU fitted-covers, remedial window-work and tailored cabinetry throughout this 3 storey townhouse.
Sky Store, Cardiff
The team recently completed the refurbishment and fit-out of the new Sky store in the Welsh capital. This is the largest premises in their roll-out to date. This involved the entire renovation of the existing space, including altering ceiling heights for a far more modern aesthetic. We worked in lockstep with the Client and Mall Management to ensure delivery was made to programme, despite a tight turnaround time. This 3900 sq ft space was completed to a high specification with new flooring, tiling, walls and ceilings installed, together with complete redecoration. We also installed the back of house secure stockroom as well as the large rigger above the shop floor.
Hays Mews, Mayfair
Construction of a new mansard roof and cast in-situ stairs to this 5 storey, listed, Mews property. Refurbishment and decoration of sash windows, the installation of new flooring and doors, renovation of existing Ballroom doors as well as the manufacture and installation of bespoke joinery for Reception Area.
Hotel Indigo, Bath
This most recent project incorporated the complete refurbishment and renovation of the 166-room Hotel Indigo, Bath. The hotel is on South Parade, a Grade I-Listed building in the heart of Bath. It involved the removal and renovation of 625 sliding sash windows and subsequent re-decoration. The works required the setup of a small joinery workshop on site to produce moulds, staircase sections and re-produce numerous matching joinery items.
The Arora Hotel at The O2 Arena
This central London hotel is home to the Largest Ballroom in Europe. Fit -Out of numerous bars and a number of meeting rooms for private business in the Hotel along with the reception area were completed. We also had to incorporate the link corridor directly to the O2 Arena next door.